
Since 1997, NU-Line has been building and maintaining powerline for Alberta’s utilities ad coal mines. In 2009, the Whitehorse office was opened to serve the mines and utilities in the region.

|
|

Some of our recent powerline projects include: Mine – 6 km of 477 Pelican main line with four 3/0 Pigeon stub-
lines totalling 4km. This line included five air-brakes
and required extensive use of all-terrain equipment.

|

NU-Line continuously seeks qualified, elite personnel to assist with growing our company. Available positions vary
by location.

|
|

Alberta Operations
Phone: 780-789-4142
Yukon Operations
Phone: 867-393-2066

|